A means of basal reinforcement was required and Maccaferri France was selected to provide a solution for piled embankments. An 11m-high and 62m-wide embankment was introduced between PR305-075 and ...
a concrete piled wall built behind the existing river wall, and trees and vegetation planted alongside the embankment once it’s been stabilised.
当前正在显示可能无法访问的结果。
隐藏无法访问的结果